- Potterton Programmer Instruction Manual Transmission
- What Is An Instruction Manual
- Products
Products
Gas boilers
Commercial solutions
Where to buy
Potterton Gold
Potterton Titanium
Discontinued boilers
Accessories and controls
- Services
Services
NewDesign
Training
Whole life costing
Potterton Hub
- Customer Support
Customer Support
Repairs
Servicing
In warranty enquiries
Genuine Parts
Maintenance plans
Technical Advice
Warranty registration
Error codes
- Advice
Advice
Winter Advice
Tenants Guide leaflets
FAQs
- Literature
- About Us
About Us
About Potterton
Mission Vision and Values
Potterton Commercial
Our History
CSR
Case Studies and News
- Legislation
Legislation
Building Regulations
ErP
EPCs
Government funding
London Boiler Cashback Scheme
Boiler Plus
- Contact us
Service Manual POTTERTON EP2002 - This Service Manual or Workshop Manual or Repair Manual is the technical document containing instructions on how to keep the product working properly. It covers the servicing, maintenance and repair of the product. Dec 08, 2012 The Potterton PROGRAMMER is a BP 2002 Plumber: Andrew Smith, Engineer replied 7 years ago Try this; POTTERTON CONTROLS CUSTOMER GUIDE FOR THE EP2000/EP2002/EP3002 1) THE PROGRAMMER AND YOUR SYSTEM If you have an EP2000 Programmer, then you can set the HOT WATER and CENTRAL HEATING to come ON together for two time periods a day. Do you still require the instruction manual for you potterton ep3001 thanks if you have it I would take a copy I have now bought a potterton ep6002 controller which I bought brand new online for £43, it fits on the same backplate as the ep3001 so was only a 5 minute job to fit.
Download Installation and servicing instructions of Potterton Gold 11 kW Boiler for Free or View it Online on All-Guides.com. This version of Potterton Gold 11 kW Manual compatible with such list of devices, as: Gold 11 kW, Gold 12 kW, Gold 4 kW, Gold 6 kW, Gold 9 kW
Brand: Potterton
Category: Boiler
Game genie save editor serial key and email. Type: Installation and servicing instructions
Model: Potterton Gold 11 kW , Potterton Gold 12 kW , Potterton Gold 4 kW , Potterton Gold 6 kW , Potterton Gold 9 kW
Pages: 28
ALL WIRING MUST BE CARRIED OUT IN ACCORDANCE WITH CURRENT IEE WIRING REGULATIONS.
The POTTERTON GOLD boiler must be installed by a qualified competent tradesman in accordance
with supplied instructions and drawings to ensure correct operation.
Check the main incoming supply to the property to ensure there is sufficient current and voltage
for the size of the boiler or boilers to be installed. Remember to also take account of the supply
requirements for the rest of the property. Ensure the correct cable size is used to feed the boiler
A double pole RCD with a trip level sensitivity of 30mA and capable of breaking the full load current

In order to provide a means of isolation, the boiler must be connected to the supply through a double
pole linked switch with a minimum contact gap of 3mm in all poles. The RCD is suitable for this
requirement if it is mounted in close proximity to the boiler.
A correctly rated MCB must be used in the supply, see Technical Specifications (page 3). An additional
3A supply is required for the controls etc. NOTE, a blank must be fitted between each MCB to provide
ventilation, check with the MCB manufacturer/supplier.
NOTE: The high current mains supply MUST NOT be routed through the programmer, controls etc.
Follow the wiring diagrams. Use a standard programmer, room thermostat, etc. The high current
switching is carried out inside the boiler, only standard switched live (low current) control signals
Electrical Connections
Access can be gained to the electrical connections by removing the top front panel.
CONN 5: MAIN POWER. Main power-supply cables. Connect the power cables from the power 1.
“supply”(CONN 5) terminals onthe PCB assembly in the boiler directly to the isolation switch,live,
Potterton Programmer Instruction Manual Transmission
neutral and earth. Use the correct rated cable. Do not connect the power through the programmer,
thermostats etc. The main power PCB terminals in the boiler are suitable for cables up to 10mm
.
NOTE: THESE CONNECTIONS MUST BE TIGHT. LOOSE CONNECTIONS WILL CAUSE BURNING AT
CONN 5 CONNECTOR, THIS IS NOT COVERED BY THE WARRANTY.
CONN 1 pins 2 & 3: CONTROL SIGNAL. Connect switched live to ‘R’ and neutral to ‘N’ on the 2.
control terminal block in the boiler to the switched live and neutral from the programmer control
circuit. A neutral must be connected, as this control signal is optically isolated from the main
supply in the boiler and will not run without a neutral. Do not connect any wires to the terminal
CONN 1 pins 4, 5 & 6: PUMP CONNECTIONS. The supply to the pump must be connected to the 3.
‘PUMP’ terminal on the control terminal block in the boiler. This supply is fused in the boiler at
Cable access is made from either the right or left hand side via the x3 knockouts provided (x1 4.
25mm for power and x2 20mm for pump and thermostat cables). Having decided which side to
route the cables, remove x3 knockouts only (This can be achieved with a small tap from a ball
nose hammer, then twisting the knockout untill it is removed. Note: Take care not to damage the
casing, ensure the metal discs are retrieved and no sharp edges are present. The cables should
be installed using a cable compression gland (not supplied).
LEFT HAND SIDE
RIGHT HAND SIDE
Related Products for Potterton Gold 4 kW
Related Manuals for Potterton Gold 4 kW
What Is An Instruction Manual
Potterton Gold 4 kW: Frequently viewed Manuals
Comments are closed.